Operating Statistics

Infrastructure

500 miles gas gathering infrastructure; 300 miles of water gathering and distribution pipelines;
4 water treatment and storage facilities with 1.2MMBLS of produced water storage capacity.

0

Producing Wells

0

Future Well Locations

Total Acreage

50,000 acres of Caerus-owned surface and minerals.

0

Total Acreage (M gross)

0

Total Acreage (M net)

Proved Reserves

BCFE

PUD

57%

Production

MMCFED

Gas

92%

Net Acreage

M

HBP

90%
brent_driggsOperating Statistics